Air Dispersion Modeling with AERMOD
The Project: Air Re-Entrainment Analysis ????Confidential The Challenge Growth and Demand Requires More Emergency Power EARTHRES was contracted by a Medical Care Facility to conduct
The Project: Air Re-Entrainment Analysis ????Confidential The Challenge Growth and Demand Requires More Emergency Power EARTHRES was contracted by a Medical Care Facility to conduct
The Project: Effluent Force Main Design 📍Confidential The Challenge EARTHRES prepared the detailed design, permit application documents and construction bid packages for the construction of
The Project: Medical Waste Facility Design & Permitting 📍Northeastern, Pennsylvania The Challenge EARTHRES was approached by Sharps Compliance, Inc., a leading provider of comprehensive waste
The Project: Feasibility Study LFGTE Pilot ????Zacatecas, Mexico The Challenge Funded by a grant through the USTDA, EARTHRES was contracted to conduct a feasibility study
The Project: Mining Bathymetry Survey 📍United States The Challenge A mining client (company confidential) needed reserve estimates and permitted depth data to verify tonnage calculations,
The Project: LFGTE System Design 📍Confidential The Challenge Provide landfill gas-to-energy (LFGTE) system design and construction support services for a 500-foot LFG pipeline from an
The Project: EARTHRES Landfill Services 📍United States The Challenge Managing the landfill gas system, with all the monitoring and compliance work it requires. How does
EARTHRES is Engineering for SuccessSM