Search
Close this search box.

DPCC DCR Spill Plan

SHARE THE CASE STUDY:

The Project: DPCC DCR Spill Plan

đź“ŤBurlington Township, New Jersey

The Challenge

Our client needed EARTHRES to prepare a renewal of an existing DPCC DCR spill plan. This Discharge Prevention Control and Countermeasure and Discharge clean up and removal plan was required due to the greater than the 20,000-gallon storage capacity of hazardous materials as well as multiple oil storage locations.

The Solution

Hazmat Inventory

EARTHRES Group, Inc., performed a site visit, reviewed existing facility records and conducted a hazardous materials (HAZMAT) inventory of the facility.  During this process, they documented secondary containment structures, spill kit locations, and direction of flow in the event of a discharge.

Spill Plan Development

Based on this information, EARTHRES prepared site figures in Autodesk AutoCAD®, inspection logs, training logs, spill response forms, and an updated Discharge Prevention Control and Countermeasure and Discharge Cleanup and Removal (DPPC DCR) Plan.  The submittal was certified by an EARTHRES licensed Professional Engineer and provided to the New Jersey Department of Environmental Protection (NJ DEP) for compliance with the State’s required renewal every three years.

The Results

Our client’s facility is now in compliance with NJ DEP regulations for having updated DPCC and DCR plans.

Have a similar challenge?

News and knowledge

Solving tough challenges with good engineering.

Case study library

Solving tough challenges with good engineering.