Energy | Mining | Solid Waste | Manufacturing | Food & Beverage | Commercial | Government
Our client (company confidential) wanted to increase their natural gas compressor station operating capacity while decreasing operating costs. They wanted to achieve this by modifying their existing and costly methanol-based antifreeze system to a gas-gas heat exchanger system to accomplish the temperature stabilization. One caveat, construction must be completed while the station was in operation, with minimal downtime to keep with demand. Read more...
Planned and implemented for the development of a 1-3 MW USTDA Landfill Gas to Energy pilot project facility in Zacatecas, Mexico, this feasibility study is successfully completed and officially approved by both the Grantee and USTDA.
Project Spotlight - EARTHRES completes Cathodic Protection optimization on 300 miles high-pressure midstream gas lines ensuring system integrity and peak flow.
EARTHRES provides a full range of landfill gas (LFG) system management services for its clients, including operation, troubleshooting, monitoring, maintenance, and compliance reporting of the active gas collection and control systems.
EARTHRES was contracted by one developer to help standardize its equipment installations by analyzing several completed installations and preparing as-built 3-D drawings of the preferred equipment arrangements.
EARTHRES obtains expedited permitting for a drilling industry chemical terminal in Central Pennsylvania. Includes bulk and container storage of flammable and combustible materials.
EARTHRES provides award-winning landfill gas (LFG) system design and construction support services for a 500-foot LFG pipeline from an existing enclosed flare to a 10 MW landfill gas-to-energy plant.
Always ready and willing to implement the latest technology to provide high quality work products to save the client time and money, EARTHRES reviewed options for completing the project and determined that a combination of drone aerial survey, traditional ground survey, and single beam sonar bathymetry would be the most economical and time-conscious approach.
EARTHRES industrial minerals consulting can provide new sales channels for your waste stream. Talk with us today.
EARTHRES provided air quality support for stack emissions testing of a new steam boiler in Schuylkill County, PA.
Planned and implemented for the development of a 1-3 MW USTDA Landfill Gas to Energy pilot project facility in Zacatecas, Mexico, this feasibility study is successfully completed and officially approved by both the Grantee and USTDA.
EARTHRES was approached by Sharps Compliance, Inc., a leading provider of comprehensive waste management solutions, to lead the medical waste facility design and permitting efforts for their new medical waste processing and warehouse distribution facility in northeast Pennsylvania.
EARTHRES provides a full range of landfill gas (LFG) system management services for its clients, including operation, troubleshooting, monitoring, maintenance, and compliance reporting of the active gas collection and control systems.
Project Showcase: EARTHRES designed and completed permitting for construction of a 5-mile long effluent force main for the conveyance of pretreated leachate.
EARTHRES provides award-winning landfill gas (LFG) system design and construction support services for a 500-foot LFG pipeline from an existing enclosed flare to a 10 MW landfill gas-to-energy plant.
EARTHRES provided air quality support for stack emissions testing of a new steam boiler in Schuylkill County, PA.
EARTHRES was contracted by the client to provide environmental consulting services for their facility in Trenton, NJ. EARTHRES also completed various permitting and compliance projects.
Project Showcase: EARTHRES designed and completed permitting for construction of a 5-mile long effluent force main for the conveyance of pretreated leachate.
EARTHRES performs hydrological investigations in support of a new source spring water permit in an Exceptional Value watershed.
Project Spotlight – EARTHRES provided engineering, consulting, design and fabrication support for multiple facets of low lake level pumping station well drilling project.
EARTHRES assists with coastal restoration and revetment project to restore the Naval Air Station facility after a hurricane ripped through caused damage.
EARTHRES performs hydrological investigations in support of a new source spring water permit in an Exceptional Value watershed.
EARTHRES partners with two other firms to secure a contract for environmental services under the U.S. EPA 2010 Brownfields Assessment Grant.
Project Spotlight – EARTHRES conducted an RCRA facility investigation and corrective measures study in support of soil and groundwater remediation of chlorinated VOCs.
EARTHRES prepared the air quality plan approval application for a 10-MW hospital cogen project in Reading, PA. This combined heat and power (CHP) will simultaneously generate both electricity and heat, providing significant cost reduction.
EARTHRES assists with coastal restoration and revetment project to restore the Naval Air Station facility after a hurricane ripped through caused damage.
EARTHRES partners with two other firms to secure a contract for environmental services under the U.S. EPA 2010 Brownfields Assessment Grant.
EARTHRES prepares renewal of existing GSA DPCC DCR spill plan for our clients. This plan was required for the over 20,000-gallon storage capacity of hazardous materials and oil storage.
Project Spotlight – EARTHRES conducted an RCRA facility investigation and corrective measures study in support of soil and groundwater remediation of chlorinated VOCs.
Copyright Earthres Group, Inc. © 2023 EARTHRES. All rights reserved.